CNW: Outcome of First Court Hearing & Registration with ASIC
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
17 October 2023
Level 28
108 St Georges Terrace
PERTH WA 6000
ABN 98 103 348 947
ASX CNW
Court approves convening of Scheme Meeting &
distribution of Scheme Booklet and Scheme
Booklet registered with ASIC
Cirrus Networks Holdings Limited (ASX: CNW) (Cirrus) is pleased to provide the following update in relation to
the proposed acquisition of Cirrus by Atturra Holdings Pty Ltd, a wholly owned subsidiary of Atturra Limited
(ASX:ATA) by way of scheme of arrangement (Scheme), as announced to ASX on 11 and 15 September 2023.
Court approval to convene Scheme Meeting
The Supreme Court of New South Wales (Court) has today made orders approving:
The convening of a meeting of Cirrus shareholders for the purposes of considering and voting on the
proposed Scheme (Scheme Meeting); and
The dispatch of an explanatory statement providing information about the Scheme and the Notice of
Scheme Meeting (Scheme Booklet) to Cirrus shareholders.
Following today’s Court hearing, the Scheme Booklet has been registered by the Australian Securities and
Investments Commission (ASIC). A copy of the Scheme Booklet is attached to this announcement.
Scheme Meeting
The Scheme Meeting is scheduled to be held at 11.00am (Perth time) on Wednesday, 22 November 2023 in
person at Palace Meeting Room, Ground Floor, 108 St Georges Terrace, Perth, Western Australia. Details of
how to access and participate in the Scheme Meeting are contained in the Scheme Booklet.
Scheme Booklet
The Scheme Booklet includes a Notice of Meeting and an Independent Expert’s Report from Lonergan
Edwards & Associates Limited (Independent Expert). The Independent Expert has concluded that the Scheme
is fair and reasonable and in the best interests of Cirrus shareholders in the absence of a Superior Proposal.
The Scheme Booklet will be dispatched to Cirrus Networks Shareholders on or around 20 October 2023. Cirrus
shareholders who have elected to receive electronic communications will be sent an email containing
instructions about how to view or download a copy of the Scheme Booklet, as well as instructions on how to
lodge their proxies for the Scheme Meeting and lodge an election in relation to the Scheme consideration.
Cirrus shareholders who have elected to receive communications via post will be sent a printed copy of the
Scheme Booklet together with a personalised proxy form and Scheme consideration election form. All other
Cirrus shareholders will be sent a letter with instructions about how to view or download a copy of the
Scheme Booklet, together with a personalised proxy form and Scheme consideration election form. If a
shareholder is an Unmarketable Parcel Shareholder (as defined in the Scheme Booklet), they will also be
provided with information about how to opt in to receive scrip consideration.
Cirrus shareholders should read the Scheme Booklet in its entirety, before deciding whether to vote in favour
of the Scheme.
ASX ANNOUNCEMENT
17 October 2023
Level 28
108 St Georges Terrace
PERTH WA 6000
ABN 98 103 348 947
ASX CNW
Cirrus Board of Directors Unanimously Recommend the Scheme
The Cirrus Board of Directors (who collectively hold approximately 8.95% of ordinary Cirrus shares on issue as
at the date of this announcement, as set out in sections 1.5, 10.1 and 10.2 of the Scheme Booklet),
unanimously recommend that Cirrus Networks Shareholders vote in favour of the Scheme in the absence of a
Superior Proposal and subject to the Independent Expert continuing to conclude the Scheme is in the best
interests of Cirrus Networks Shareholders.1 Subject to those same qualifications, each Cirrus Networks
Director, intends to vote in favour of the Scheme, for all Cirrus Networks Shares held or controlled by them.
Further information
If you have any questions in relation to the Scheme or the Scheme Booklet, please call the Shareholder
Information Line on 1300 288 664 (within Australia) or +61 2 9698 5414 (outside Australia) between 8.30am
and 5.30pm (AEDT) Monday to Friday.
The Board of Directors at Cirrus has authorized the release of this announcement.
Contact for further information
Chris McLaughlin
Managing Director
1
Matt Green
Chief Financial Officer
08 6180 4222
investor@cirrusnetworks.com.au
cirrusnetworks.com.au
You should note that when considering this recommendation that the directors hold the interests set out in Sections 1.5, 10.1
and 10.2 of the Scheme Booklet. In particular, if the Scheme is implemented, all Equity Incentives (including the Options and
Performance Rights issued by Cirrus Networks) will be cancelled for a cancellation price of $0.063 per Equity Incentive. As a
result of such cancellation, Cirrus Networks Directors, would receive the following payments: $39,000 to Adam Waterworth and
$130,000 to Christopher McLaughlin on account the Options that those directors hold, and $221,700.91 to Christopher
McLaughlin on account of the Performance Rights that he holds.
Cirrus Networks
Holdings Limited
ACN 103 348 947
Scheme Booklet
For the recommended scheme of arrangement between Cirrus Networks Holdings
Limited ACN 103 348 947 (Cirrus Networks) and its shareholders in relation to the
proposed acquisition of all Cirrus Networks Shares by Atturra Holdings Pty Ltd ACN
132 368 104 (BidCo), a wholly owned subsidiary of Atturra Limited ACN 654 662 638
(ASX: ATA) (Atturra)
VOTE IN FAVOUR
Your Directors unanimously recommend that you vote in favour of the Scheme in the
absence of a Superior Proposal and subject to the Independent Expert continuing to
conclude that the Scheme is in the best interests of Cirrus Networks Shareholders
The Independent Expert has concluded that the Scheme is in the best interests of
Cirrus Networks Shareholders, in the absence of a Superior Proposal
This is an important document and requires your immediate attention.
You should read it carefully and in full before deciding whether or not to vote in
favour of the Scheme.
If you are in any doubt about how to deal with this document, you should
contact your broker or financial, taxation, legal or other professional adviser
immediately.
Cirrus Networks Financial Adviser
Cirrus Networks Legal Adviser
Important notices
General
This Scheme Booklet is important and requires your
immediate attention. You should read this Scheme Booklet
carefully and in full before making a decision about how to
vote at the Scheme Meeting.
Defined terms
A number of defined terms are used in this Scheme Booklet.
These terms are explained in Section 11.
Nature of this document
The purpose of this Scheme Booklet is to explain the terms of
the Transaction and the manner in which the Scheme will be
considered and implemented (if approved) and to provide
such information as is prescribed or otherwise material to the
decision of Cirrus Networks Shareholders whether or not to
approve the Scheme. This Scheme Booklet includes the
Explanatory Statement required to be sent to Cirrus Networks
Shareholders under Part 5.1 of the Corporations Act.
No investment advice
The information contained in this Scheme Booklet does not
constitute financial product advice and has been prepared
without reference to your own investment objectives, financial
situation, taxation position and particular needs. It is important
that you read this Scheme Booklet carefully and in its entirety
before making any investment decision and any decision as
to whether or not to vote in favour of the Scheme. If you are in
any doubt in relation to these matters, you should consult
your financial, legal, stockbroking, taxation or other
professional adviser.
Not an offer
This Scheme Booklet does not constitute or contain an offer
to Cirrus Networks Shareholders, or a solicitation of an offer
from Cirrus Networks Shareholders, in any jurisdiction.
Foreign jurisdictions
The release, publication or distribution of this Scheme Booklet
in jurisdictions other than Australia may be restricted by law
or regulation in such other jurisdictions and persons outside
of Australia who come into possession of this Scheme
Booklet should seek advice on and observe any such
restrictions. Any failure to comply with such restrictions may
constitute a violation of applicable laws or regulations.
This Scheme Booklet has been prepared in accordance with
Australian law and the information contained in this Scheme
Booklet may not be the same as that which would have been
disclosed if this Scheme Booklet had been prepared in
accordance with the laws and regulations outside Australia.
This Scheme Booklet is not a New Zealand disclosure
document, and has not been registered, filed with or
approved by any New Zealand Regulatory Authority with the
Financial Markets Conduct Act 2013 or any other New
Zealand law. The offer of New Atturra Shares under the
Scheme is being made to existing Cirrus Networks
Shareholders in reliance upon the Financial Markets Conduct
(Incidental Offers) Exemption Notice 2021 and, accordingly,
this Scheme Booklet may not contain all the information that a
disclosure document is required to contain under New
Zealand law.
Scheme Shareholders that are Ineligible Foreign
Shareholders will not be able to receive New Atturra Shares
as part of their Scheme Consideration and will instead receive
cash under the Sale Facility in respect of those New Atturra
Shares that would otherwise have been issued to them.
Role of ASIC and ASX
This document is the explanatory statement for the scheme of
arrangement between Cirrus Networks and the holders of its
fully paid ordinary shares as at the Record Date for the
purposes of section 412(1) of the Corporations Act. A copy of
the proposed Scheme is included in this Scheme Booklet as
Annexure C.
A copy of this Scheme Booklet has been registered with ASIC
for the purposes of section 412(6) of the Corporations Act.
ASIC has been given the opportunity to comment on this
Scheme Booklet in accordance with section 411(2)(b) of the
Corporations Act. Neither ASIC nor any of its officers takes
any responsibility for the contents of this Scheme Booklet.
ASIC has been requested to provide a statement, in accordance
with section 411(17)(b) of the Corporations Act, that ASIC has no
objection to the Scheme. If ASIC provides that statement, it will
be produced to the Court at the time of the Court hearing to
approve the Scheme.
A copy of this Scheme Booklet has been provided to ASX.
Neither ASX nor any of its officers takes any responsibility for
the contents of this Scheme Booklet.
Notice of Scheme Meeting
The Notice of Meeting is set out in Annexure E.
Notice of Second Court Hearing
At the Second Court Hearing, the Court will consider whether
to approve the Scheme following the vote at the Scheme
Meeting.
Any Cirrus Networks Shareholder may appear at the Second
Court Hearing, expected to be held at 11.00am (Sydney time)
on Friday 24 November 2023 at the Supreme Court of New
South Wales, 184 Phillip Street, Queens Square, Sydney
NSW 2000.
Any Cirrus Networks Shareholder who wishes to oppose
approval of the Scheme at the Second Court Hearing may do
so by filing with the Court and serving on Cirrus Networks a
notice of appearance in the prescribed form together with any
affidavit that the Cirrus Networks Shareholder proposes to
rely on.
Important notice associated with the Court order under
section 411(1) of the Corporations Act
The fact that the Court has ordered under section 411(1) of
the Corporations Act that the Scheme Meeting be convened
and has directed that the Scheme Booklet accompany the
Notice of Meeting does not mean that the Court:
•
has formed any view as to the merits of the proposed
Scheme nor as to how Cirrus Networks Shareholders
should vote (on this matter Cirrus Networks Shareholders
must reach their own decision);
•
has prepared, or is responsible for, the content of the
Scheme Booklet; or
•
has approved or will approve the terms of the Scheme.
The order of the Court that the Scheme Meeting be convened
is not, and should not be treated as, an endorsement by the
Court of, or any other expression of opinion by the Court on,
the Scheme.
Disclaimer as to forward-looking statements
This Scheme Booklet contains both historical and forwardlooking statements. All statements other than statements of
historical fact are, or may be deemed to be, forward-looking
statements.
All forward-looking statements in this Scheme Booklet reflect
views only as at the Last Practicable Date, and generally may
be identified by the use of forward-looking words such as
"believe", "aim", "expect", "anticipate", "intending",
"foreseeing", "likely", "should", "planned", "may", "estimate",
"potential", or other similar words. Similarly, statements that
describe Cirrus Networks’, BidCo’s, or Atturra’s objectives,
plans, goals or expectations are or may be forward-looking
statements.
The statements contained in this Scheme Booklet about the
impact that the Scheme may have on the results of Cirrus
Networks’ or the Enlarged Group’s operations and the
advantages and disadvantages anticipated to result from the
Scheme, are also forward-looking statements.
other things, are subject to any necessary approvals from
Government Agencies.
These forward-looking statements involve known and
unknown risks, uncertainties and other factors that may cause
actual results, performance or achievements to differ
materially from the anticipated results, performance or
achievements, expressed, projected or implied by these
forward-looking statements.
Implied Value
The operations and financial performance of Cirrus Networks,
Atturra and BidCo are subject to various risks, including those
summarised in this Scheme Booklet, which may be beyond
the control of Cirrus Networks, Atturra and BidCo. Cirrus
Networks Shareholders should note that the historical
financial performance of Cirrus Networks or the Atturra Group
is no assurance of future financial performance of Cirrus
Networks or the Enlarged Group (whether the Scheme is
implemented or not). Those risks and uncertainties include
factors and risks specific to the industry in which Cirrus
Networks, BidCo and Atturra operate as well as general
economic conditions, prevailing exchange rates and interest
rates and conditions in the financial markets. As a result, the
actual results of operations and earnings of Cirrus Networks
following implementation of the Scheme, as well as the actual
advantages of the Scheme, may differ significantly from those
that are anticipated in respect of timing, amount or nature and
may never be achieved.
The forward-looking statements included in this Scheme
Booklet are made only as of the Last Practicable Date.
Any forward-looking statements included in the Cirrus
Networks Information have been made on reasonable
grounds. Although Cirrus Networks believes that the views
reflected in any forward-looking statements included in the
Cirrus Networks Information have been made on a
reasonable basis, no assurance can be given that such views
will prove to have been correct.
Any forward-looking statements included in the Atturra
Information have been made on reasonable grounds.
Although BidCo and Atturra believe that the views reflected in
any forward-looking statements included in the Atturra
Information have been made on a reasonable basis, no
assurance can be given that such views will prove to have
been correct.
None of Cirrus Networks, Atturra or BidCo or their respective
officers or any persons named in this Scheme Booklet with
their consent or any person involved in the preparation of this
Scheme Booklet makes any representation or warranty
(express or implied) as to the likelihood of fulfilment of any
forward-looking statement, or any events or results expressed
or implied in any forward-looking statement, except to the
extent required by law. You are cautioned not to place undue
reliance on any forward-looking statement.
All subsequent written and oral forward-looking statements
attributable to Cirrus Networks, BidCo, Atturra or any person
acting on their behalf are qualified by this cautionary
statement.
Subject to any continuing obligations under relevant laws or
the listing rules of a relevant exchange, Cirrus Networks,
Atturra and BidCo do not give any undertaking to update or
revise any such statements after the Last Practicable Date, to
reflect any change in expectations in relation thereto or any
change in events, conditions or circumstances on which any
such statement is based.
You should review all of the information in this Scheme
Booklet carefully. Section 1.2 sets out the reasons why you
should vote in favour of the Scheme and Section 1.3 sets out
the reasons why you may not wish to vote in favour of the
Scheme.
Timetable and dates
All times and dates referred to in this Scheme Booklet are
times and dates in Perth, Western Australia or Sydney, New
South Wales as the context requires. In particular where a
reference is to a time in respect of the Court, such reference
will be in respect of Sydney, NSW time and where a
reference to time is in respect of the Scheme Meeting, such
reference will be in respect of Perth, Western Australia. All
times and dates relating to the implementation of the Scheme
referred to in this Scheme Booklet may change and, among
3469-1776-3109v25
As Cirrus Network Shareholders have the option to elect that
all or a portion of their Scheme Consideration comprises New
Atturra Shares, the value of that portion of the Scheme
Consideration is not fixed and will vary with the market price
of New Atturra Shares. This also applies to Ineligible Foreign
Shareholders, whose Scheme Consideration, in part, may
comprise New Atturra Shares, which will be remitted to the
Sales Agent to sell on the Ineligible Foreign Shareholder’s
behalf. Any cash remitted to Ineligible Foreign Shareholders
under the Sale Facility will depend on the market price of the
Atturra Shares at the time of sale by the Sale Agent and will
be less any applicable taxes, brokerage and other charges
incurred by Atturra or the Sale Agent in connection with the
sale.
Effect of rounding
A number of figures, amounts, percentages, prices,
estimates, calculations of value and fractions in this Scheme
Booklet, including in respect of the Scheme Consideration,
are subject to the effect of rounding (unless otherwise stated).
Accordingly, the actual calculation of these figures may differ
from the figures set out in this Scheme Booklet.
No website is part of this Scheme Booklet
Atturra and Cirrus Networks each maintain websites at
https://atturra.com/au-en/ and https://cirrusnetworks.com.au/
respectively. Any references in this Scheme Booklet to those
or other internet sites are for information purposes only and
do not form part of this Scheme Booklet.
Responsibility statement
Cirrus Networks has been solely responsible for preparing the
Cirrus Networks Information. BidCo and Atturra and their
directors and officers do not assume any responsibility for the
accuracy or completeness of any such Cirrus Networks
Information.
BidCo and Atturra have been solely responsible for preparing
the Atturra Information. The information concerning BidCo,
Atturra and the intentions, views and opinions of BidCo and
Atturra contained in this Scheme Booklet have been prepared
by BidCo and Atturra and are the responsibility of BidCo and
Atturra. Cirrus Networks and the Cirrus Networks Directors
and officers do not assume any responsibility for the accuracy
or completeness of any such Atturra Information.
Lonergan Edwards & Associates Limited has prepared the
Independent Expert’s Report in relation to the Scheme and
takes responsibility for that report. The Independent Expert’s
Report is set out in Annexure B.
Automic Pty Limited was not involved in the preparation of
any part of this Scheme Booklet other than being named as
the Share Registry. Automic Pty Limited has not authorised or
caused the issue of, and expressly disclaims and takes no
responsibility for, any part of this Scheme Booklet.
No consenting party has withdrawn their consent to be named
before the date of this Scheme Booklet.
Privacy
Cirrus Networks, Atturra and BidCo may collect personal
information in the process of implementing the Scheme. Such
information may include the name, contact details and
shareholdings of Cirrus Networks Shareholders and the name
of persons appointed by those persons to act as a proxy,
attorney or corporate representative at the Scheme Meeting.
The primary purpose of the collection of personal information
is to assist Cirrus Networks, Atturra and BidCo to conduct the
Scheme Meeting, implement the Scheme, account to you for
the Scheme Consideration and make payment of net sale
proceeds to Ineligible Foreign Shareholders. Personal
information of the type described above may be disclosed to
the Share Registry and Atturra Registry, print and mail
service providers, authorised securities brokers, Related
Bodies Corporate of Cirrus Networks, Atturra and BidCo, and
Cirrus Networks, Atturra and BidCo’s advisers and service
providers. Cirrus Networks Shareholders have certain rights
to access personal information that has been collected. Cirrus
Networks Shareholders should contact the Share Registry in
page 3
the first instance if they wish to access their personal
information. Cirrus Networks Shareholders who appoint a
named person to act as their proxy, attorney or corporate
representative should ensure that they inform that person of
these matters.
This Scheme Booklet is dated 17 October 2023.
Date of this Scheme Booklet
3469-1776-3109v25
page 4
Contents
Contents
1
Important dates for the Scheme
2
Letter from the Chairman of Cirrus Networks
4
1
Key considerations relevant to your vote
8
2
Frequently asked questions
22
3
Next steps
32
4
Overview and key steps
34
5
Information about Cirrus Networks
43
6
Information about Atturra and BidCo
54
7
Overview of the Enlarged Group
72
8
Risks
86
9
Tax implications of the Scheme
92
10
Additional information
97
11
Glossary and interpretation
108
Annexure A
Atturra Group Structure Diagram
123
Annexure B
Independent Expert’s Report
124
Annexure C
Scheme
125
Annexure D
Deed Poll
126
Annexure E
Corporate Directory
3469-1776-3109v25
132
page 1
Important dates for the Scheme
Execution of Scheme Implementation Deed
Sunday 10 September 2023
ASX Announcement of Scheme Implementation Deed
Monday 11 September 2023
ASX Announcement of increased consideration
Friday 15 September 2023
Date of this Scheme Booklet
Tuesday 17 October 2023
Latest time and date for receipt of Proxy Forms and powers of
attorney for the Scheme Meeting
11.00am (Perth time), Monday
20 November 2023
Time and date for determining eligibility to vote at the Scheme
Meeting
7.00pm (Sydney time),
Monday 20 November 2023
Scheme Meeting to be held at Palace Meeting Room, Ground
Floor, 108 St Georges Terrace, Perth, Western Australia
11.00am (Perth time),
Wednesday 22 November
2023
If the Scheme is approved by the Requisite Majorities of Cirrus Networks Shareholders
Second Court Date for approval of the Scheme
Friday 24 November 2023
Effective Date
Monday 27 November 2023
Court order lodged with ASIC and announcement to ASX
Last day of trading in Cirrus Networks Shares (with Cirrus
Networks Shares suspended from trading on ASX from close of
trading)
Record Date for determining entitlements to Scheme
Consideration
7:00pm Sydney Time, Monday
4 December 2023
Implementation Date and provision of Scheme Consideration
Monday 11 December 2023
All dates following the date of the Scheme Meeting are indicative only and, among other things, are
subject to all necessary approvals from the Court. Any changes to the above timetable (which may
include an earlier or later date for the Second Court Hearing) will be announced through ASX and
notified on Cirrus Networks Holdings’ website at https://cirrusnetworks.com.au/investor-information/.
Cirrus Networks may vary the timetable detailed above subject to the approval of such variation by
BidCo, the Court and ASIC where required.
All references to time in this Scheme Booklet are references to Perth, Western Australia time or
Sydney, New South Wales time as the context requires. In particular where a reference is to a time in
respect of the Court, such reference will be in respect of Sydney NSW time and where a reference to
time is in respect of the Scheme Meeting, such reference will be in respect of Perth, Western
3469-1776-3109v25
page 2
Australia time. Any obligation to do an act by a specified time in an Australian time zone must be done
at the corresponding time in any other jurisdiction.
Cirrus Networks Shareholders who have elected to receive communications electronically will be sent
an email which contains instructions about how to download a copy of this Scheme Booklet, and to
lodge their proxy vote online. The Scheme Booklet will also be available for viewing and downloading
on the Cirrus Networks website at https://cirrusnetworks.com.au/investor-information/.
3469-1776-3109v25
page 3
Letter from the Chairman of Cirrus Networks
Dear fellow Cirrus Networks Shareholder
On behalf of the Cirrus Networks Board, I am pleased to present you with this Scheme Booklet for
your consideration.
Background
On 11 September 2023, Cirrus Networks Holdings Limited announced that it had entered into a
Scheme Implementation Deed with Atturra Holdings Pty Ltd ACN 132 368 104 (BidCo), a wholly
owned subsidiary of Atturra Limited ACN 654 045 557 (Atturra), under which it is proposed that
BidCo will acquire 100% of Cirrus Networks by way of a Scheme of Arrangement. On 15 September
the parties entered into a deed of amendment and restatement in respect of the Scheme
Implementation Deed due to BidCo increasing the Scheme Consideration it wished to pay to Cirrus
Network Shareholders. The Scheme Implementation Deed was further amended and restated on 3
October 2023 to include a Sale Agent concept for Ineligible Foreign Shareholders (discussed at
section 4.9).
This Scheme Booklet has been sent to you because you are being asked to vote on the Scheme.
Scheme Consideration
If the Scheme is approved and implemented, Cirrus Networks Shareholders will be given the
opportunity to elect to receive:
•
the Default Consideration – whereby the Cirrus Networks Shareholder elects to receive for each
Cirrus Networks Share they hold:
a.
$0.0473 in cash; and
b.
0.0179 New Atturra Shares,
•
the Maximum Cash Consideration – whereby the Cirrus Networks Shareholder elects to receive
100% cash for each Cirrus Networks Share (which equals (per Cirrus Networks Share) $0.0473
plus the cash value of the 0.0179 New Atturra Shares (calculated by reference to the Atturra
VWAP) and subject to customary scale back provisions, discussed at sections 4.4 and 4.5); or
•
the Maximum Share Consideration – whereby the Cirrus Networks Shareholder elects to
receive 100% of its consideration in New Atturra Shares (the number of New Atturra Shares to be
issued per Cirrus Networks Share calculated as 0.0179 New Atturra Shares plus the number of
New Atturra Shares that equals $0.0473 divided by the Atturra VWAP (being 0.0536 New Atturra
Shares)) and subject to customary scale back provisions, discussed at sections 4.4 and 4.5); or
•
the Split Consideration – whereby the Cirrus Networks Shareholder elects to receive for each
Cirrus Networks Share they hold:
a. $0.0315 cash; and
b. 0.0357 New Atturra Shares,
and subject to customary scale back provisions, discussed at sections 4.4 and 4.5.
The implied value of the Scheme Consideration, and the associated premium received by Cirrus
Networks Shareholders who will receive Atturra Shares as part of their Scheme Consideration will
shift with movements in the price of Atturra Shares up until the implementation of the Scheme, which
will impact the actual value of the Scheme Consideration received. The table in Section 1.3(d)
illustrates the Independent Expert’s assessment of the range of implied value of the Scheme
Consideration per Cirrus Networks Share under various election scenarios (assuming there is no
scaleback under the scaleback mechanisms).
If a valid election is not made by a Cirrus Networks Shareholder (who is not a Relevant Unmarketable
Parcel Shareholder) before 5.00pm (Perth time) on the Business Day prior to the Record Date or no
election is made by a Cirrus Networks Shareholder (who is not a Relevant Unmarketable Parcel
Shareholder), then that Cirrus Networks Shareholder will receive the Default Consideration.
3469-1776-3109v25
page 4
If a Cirrus Network Shareholder is an Ineligible Foreign Shareholder it will not be entitled to receive
New Atturra Shares. If an Ineligible Foreign Shareholder elects Scheme Consideration other than
Maximum Cash Consideration or fails to make an election before 5.00pm (Perth time) on the
Business Day prior to the Record Date, any New Atturra Shares it would otherwise be entitled to be
issued will be issued to an ASIC approved nominee who will sell them on behalf of the Ineligible
Foreign Shareholder and provide the Ineligible Foreign Shareholder with the net proceeds of the sale
in accordance with subsection 619(3) of the Corporations Act. Please see Section 4.9 for further
details.
If a Cirrus Networks Shareholder is an Unmarketable Parcel Shareholder as at the Record Date who
does not give an Opt-in Notice before 5.00pm (Perth time) on the Business Day prior to the Record
Date, such shareholder will receive the Maximum Cash Consideration for their Shares. Those
Unmarketable Parcel Shareholders who duly complete an Opt-in Notice can elect to receive New
Atturra Shares as part of their Scheme Consideration.
Your Directors believe that the Scheme provides an opportunity for Cirrus Networks Shareholders to
realise immediate and certain value for their Cirrus Networks Shares. Cirrus Networks Shareholders
holding Cirrus Networks Shares on the Record Date (Scheme Shareh
Share your feedback
Discover