CNW: Revised Scheme Offer from Atturra
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
September 15, 2023
Level 28
108 St Georges Terrace
PERTH WA 6000
ABN
ASX
98 103 348 947
CNW
Offer from Atturra to acquire Cirrus increased by
19% to 6.3 cents per share
Cirrus Networks Holdings Limited (“Cirrus” or the “Company”) (ASX: CNW) is pleased to announce that Atturra
Holdings Pty Ltd (“Atturra Holdings”), a subsidiary of Atturra Limited (“Atturra”) (ASX: ATA) has increased its
scheme consideration (announced in the Scheme Implementation Deed on the ASX on 11 September 2023)
from 5.3 cents to 6.3 cents per Cirrus share. The revised offer represents a 19% increase in the offer price for
Cirrus shares and values Cirrus’ equity at $58.6m.1
The revised Scheme Consideration of $0.063 per Cirrus share represents a 53.7% premium to the last
undisturbed closing price of Cirrus shares on 8 September 2023 (being the last trading day prior to the
announcement of the Scheme) and a 49.2% premium to the 30-day VWAP of Cirrus shares to 8 September
2023.
Cirrus confirms that it has agreed to Atturra’s revised offer (Revised Offer) and has entered into a Revised
Scheme Implementation Deed (SID) with Atturra Holdings, a copy of which accompanies this announcement.
The key change to the Scheme Implementation Deed is to increase the total implied Scheme Consideration
value from $0.053 per Cirrus share to $0.063 per Cirrus share. Under the terms of the Revised Scheme, Cirrus
shareholders will have the option to elect to receive consideration with a total implied value of $0.063 per
Cirrus share in one of four ways:
•
75% cash consideration and 25% share consideration, equating to 4.73 cents cash and 0.0179 Atturra
shares for each 1 Cirrus share held (Default Consideration);
•
100% cash consideration, equating to 6.3 cents cash per Cirrus share held (Cash Consideration);
•
100% share consideration, equating to 0.0715 Atturra shares for each 1 Cirrus share held (Share
Consideration); or
•
50% cash consideration and 50% share consideration, equating to 3.15 cents cash and 0.0357 Atturra
shares for each 1 Cirrus share held (Split Consideration).
Cirrus shareholders who do not make an election or who make an invalid election will receive the Default
Consideration. The ability for Cirrus shareholders to elect is subject to customary scale back provisions in the
event that Cirrus shareholders oversubscribe for either of cash or share consideration options.2
For the share consideration, Atturra’s shares are valued at a share price of 88.2 cents being the 30-day volume
weighted average price to 8 September 2023.
1 Equity offer value assuming total ordinary shares on issue of 930.0m at the Scheme Consideration price of $0.063 per
share. Cirrus performance rights and options will be cancelled for consideration prior to the Scheme being implemented
leveraging existing Cirrus cash.
2
The approximate split in the total Revised Scheme Consideration between cash and shares is subject to variation for
foreign ineligible shareholders and unmarketable parcels as described in the Scheme Implementation Deed.
ASX ANNOUNCEMENT
September 15, 2023
Level 28
108 St Georges Terrace
PERTH WA 6000
ABN
ASX
98 103 348 947
CNW
No other terms of the Scheme Implementation Deed dated 10 September 2023 have been amended, apart
from the increase to the Scheme Consideration described above as well as consequential amendments and
other non-material changes.
The Cirrus Board of Directors (who collectively hold approximately 8.95% of ordinary Cirrus shares on issue as
at the date of this announcement), have carefully considered the Revised Offer from Atturra and unanimously
recommend that Cirrus shareholders vote in favour of the scheme as amended by the revised offer (Revised
Scheme) in the absence of a Superior Proposal (as defined in the SID) and provided that the Independent
Expert concludes (and continues to conclude) that the Revised Scheme is in the best interests of Cirrus
shareholders.
The Scheme is also supported by the major shareholders of Cirrus, Microequities Asset Management Pty
Limited (Microequities) and H&G High Conviction Limited (H&G), (who collectively hold approximately 12.95%
of ordinary Cirrus shares on issue as at the date of this announcement). They have advised Cirrus they intend
to vote all Cirrus shares currently held or controlled by them, in support of the Revised Scheme and have
signed a voting intention statement with Cirrus3.
Cirrus shareholders do not need to take any action at this stage. Cirrus will keep shareholders and the market
informed in accordance with its continuous disclosure obligations.
Cirrus is being advised on the proposed Scheme by Latimer Partners as corporate advisor and Corrs Chambers
Westgarth as legal advisor.
ENDS
3
The Cirrus Board recommendation, Microequities and H&G voting intention statements are provided in the absence of a
superior proposal and subject to the Independent Expert concluding and continuing to conclude that the Revised Scheme
is in the best interests of shareholders.
ASX ANNOUNCEMENT
September 15, 2023
Level 28
108 St Georges Terrace
PERTH WA 6000
ABN
ASX
98 103 348 947
CNW
The Board of Directors at Cirrus has authorized the release of this announcement.
Contact for further information
Chris McLaughlin
Managing Director
Matt Green
Chief Financial Officer
08 6180 4222
investor@cirrusnetworks.com.au
cirrusnetworks.com.au
ABOUT CIRRUS
Cirrus Networks Holdings Limited (ASX: CNW) is an innovative Managed Services and IT Solutions provider who
engages nationally with organisations and government agencies to understand business needs and covert
these to technology outcomes which result in real business value and efficiencies. We implement and manage
leading solutions that are flexible, cost effective and of tangible operational benefit.
The diverse reach of Cirrus means the company can provide a wide range of solutions across:
• Networks and Connectivity
• Data Centre and Cloud
• Storage and Data Management
• Business Continuity and Disaster Recovery
• Cyber Security
• Workspace and End User Computing
• AI Compute and Virtualisation
• Unified communications and Telephony
• IT Service Management, Technology Consulting and
Project Management Services.
Australian sovereignty, excellent service and an innovative, holistic approach have seen Cirrus quickly grow an
extensive base of blue-chip clients across industry, government and non-for-profit sectors. Cirrus was founded
and is headquartered in Perth but has expanded into Canberra and Melbourne via a number of strategic
acquisitions.
Cirrus is a rapidly growing IT solutions provider exposed to the megatrends of AI and digitisation.
ABOUT ATTURRA
Atturra is an ASX-listed technology business providing a range of enterprise advisory, consulting, IT services
and solutions with a focus on local government, utilities, education, defence, federal government, financial
services, and manufacturing industries. Atturra has partnerships with leading global providers including
Microsoft, Boomi, Software AG, OpenText, Smartsheet, QAD, Infor, Vaultspeed, Snowflake and HPE and its
clients are some of the largest public and private-sector organisations in Australia. For more information visit:
www.atturra.com
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Execution version
Deed of amendment
and restatement
Scheme Implementation Deed Cirrus
Networks Holdings Limited
3473-3953-8726v1
© Corrs Chambers Westgarth
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Corrs Chambers Westgarth
Date: 15 September 2023
This deed is declared by:
Cirrus Networks Holdings Limited ACN 103 348 947 of Level 28, 108 St Georges
Terrace, Perth WA 6000 (Target)
Atturra Holdings Pty Ltd ACN 132 368 104 c/- Kanji Group Pty Limited, ‘Aurora Place’,
Level 33, 88 Phillip Street, Sydney NSW 2000 (Bidder)
Atturra Limited ACN 654 662 638 c/- Kanji Group Pty Limited, ‘Aurora Place’, Level 33,
88 Phillip Street, Sydney NSW 2000 (ATA)
Background
A
On 10 September 2023, Target, Bidder and ATA entered into the Scheme
Implementation Deed to record the terms of the proposed acquisition by the
Bidder of all of the ordinary shares in Target by means of a scheme of
arrangement under Part 5.1 of the Corporations Act.
B
Pursuant to clause 22.1 of the Scheme Implementation Deed, the parties wish
to amend and restate the Scheme Implementation Deed on and from the date
of this document in the manner set out in this document.
Agreed terms
1
Definitions
1.1
Definitions
In this document, unless the context requires otherwise, words defined in the
Scheme Implementation Deed have the same meaning and the following terms
have the following meanings:
1.2
Amended and
Restated Scheme
Implementation
Deed
The amended and restated scheme implementation
deed in relation to the Company in the form attached
as Schedule 1.
Effective Time
Has the meaning given in clause 2(b).
Scheme
Implementation
Deed
The Scheme Implementation Deed between Target,
Bidder and ATA dated 10 September 2023.
Construction
(a)
The rules of construction and interpretation in the Scheme
Implementation Deed apply to this document.
(b)
Headings do not affect the interpretation of this document.
3473-3953-8726v1
page 1
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Corrs Chambers Westgarth
1.3
Headings
Headings do not affect the interpretation of this document.
2
3
4
Amendment and Restatement
(a)
Pursuant to clause 22.1 of the Scheme Implementation Deed, on and
from the Effective Time, the Scheme Implementation Deed is amended
to, and restated in, the form attached as Schedule 1.
(b)
Target, Bidder and ATA will be bound by the Amended and Restated
Scheme Implementation Deed on and from the date of this document
(Effective Time).
(c)
Clause 2(a) and clause 2(b) do not affect any right or obligation of a
party that arises before the Effective Time.
Governing law and jurisdiction
(a)
This document is governed by and is to be construed in accordance with
the laws applicable in New South Wales, Australia.
(b)
Each party irrevocably and unconditionally submits to the non-exclusive
jurisdiction of the courts exercising jurisdiction in New South Wales,
Australia and any courts which have jurisdiction to hear appeals from any
of those courts and waives any right to object to any proceedings being
brought in those courts.
Warranties
Each party warrants to each other party to this document that:
(a)
it has full power and authority to enter into this document and has taken
all necessary action to authorise the execution, delivery and performance
of this document in accordance with its terms;
(b)
this document constitutes a legally valid and binding obligation of it
enforceable in accordance with its terms; and
(c)
the execution, delivery and performance of this document by it:
(i)
3473-3953-8726v1
will not contravene:
(A)
any law to which it or any of its property is subject or any
order or directive from a government body binding on it or
any of its property; or
(B)
if it is not an individual, its constituent documents, any
agreement or instrument to which it is a party or any
obligation under law or to any other person; and
(C)
there are no actions, claims, proceedings or investigations
pending or to the best of its knowledge threatened against it
2
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Corrs Chambers Westgarth
or by it that may have a material adverse effect on its ability
to perform its obligations under this document.
5
General
5.1
Further steps
Each party must promptly do whatever any other party reasonably requires of it
to give effect to this document and to perform its obligations under it.
5.2
5.3
Counterparts and electronic execution
(a)
This document may be executed in counterparts, which taken together
constitute one and the same document, and any party (including any
authorised representative of a party) may enter into this document by
executing a counterpart.
(b)
This document takes effect when the separately executed documents
are exchanged between the parties.
(c)
Without limiting the foregoing, if any of the signatures on behalf of one
party are on different counterparts or copies of this document, this shall
be taken to be, and have the same effect as, signatures on the same
counterpart and on a single copy of this document.
(d)
A party who has executed a counterpart of this document may exchange
it with another party by emailing a pdf (portable document format) copy
of the executed counterparty to that other party at the address set out in
the Scheme Implementation Deed.
(e)
A party may electronically sign an electronic copy of this document (via
DocuSign or similar applications or by affixing an electronic copy of any
relevant signature) and bind itself accordingly. This will satisfy all other
requirements for this document to be in writing and signed by that party.
The parties intend that any electronic copy so signed will constitute an
executed original counterpart, and any print-out of the copy with the
relevant signatures appearing will also constitute an executed
counterpart.
Costs
Each party must pay its own costs (including legal costs) and expenses in
connection with the negotiation, preparation and delivery of this document.
5.4
Entire understanding
(a)
This document contains the entire understanding between the parties as
to the subject matter of this document.
(b)
All previous negotiations, understandings, representations, warranties,
memoranda or commitments concerning the subject matter of this
document, including the Scheme Implementation Deed are merged in
and superseded by this document and are of no effect. No party is liable
to any other party in respect of those matters.
(c)
No oral explanation or information provided by any party to another:
3473-3953-8726v1
3
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Corrs Chambers Westgarth
5.5
(i)
affects the meaning or interpretation of this document; or
(ii)
constitutes any collateral agreement, warranty or understanding
between any of the parties.
Deed
This document is a deed. Factors which might suggest otherwise are to be
disregarded.
3473-3953-8726v1
4
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Corrs Chambers Westgarth
Schedule 1
Amended and Restated Scheme Implementation Deed
3473-3953-8726v1
5
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Amended and restated
Scheme
Implementation Deed
Cirrus Networks Holdings Limited
3454-3513-6293v14
Amended and restated Scheme Implementation Deed
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Contents
1
Definitions
1
2
Agreement to propose and implement
24
2.1
2.2
24
24
3
4
5
6
Target to propose Scheme
Agreement to implement Scheme
Conditions Precedent
25
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
25
27
27
28
29
29
30
30
Conditions Precedent to Scheme
Reasonable endeavours
Regulatory matters
Waiver of Conditions Precedent
Notices in relation to Conditions Precedent
Consultation on failure of Condition Precedent
Failure to agree
Scheme voted down because of the Headcount Test
Outline of Scheme
30
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
30
31
31
31
32
33
34
35
35
36
37
Proposal of Scheme
Scheme Consideration
Provision of Scheme Consideration
Entitlement
Scale-back if the Maximum Cash Consideration Pool is exceeded
Scale-back if the Maximum Share Consideration Pool is exceeded
Fractional elements
Deed Poll
Withholding
New ATA Shares to rank equally
No amendment to the Scheme without consent
Treatment of other Target securities
37
5.1
5.2
37
37
Target securities
Target Security Interests
Implementation
37
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
37
38
42
45
45
45
45
46
46
46
General obligations
Target’s obligations
Bidder and ATA
Scheme Booklet responsibility statement
Disagreement on content of Scheme Booklet
Verification
Conduct of Court proceeding
Appeal process
No partnership or joint venture
Timetable
3454-3513-6293v14
Amended and restated Scheme Implementation Deed
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
7
8
9
10
11
12
Target Board recommendation
46
7.1
7.2
46
47
Target Board recommendation
Withdrawal or change of recommendation
Directors and employees
47
8.1
8.2
8.3
8.4
8.5
8.6
8.7
47
48
48
49
49
49
49
Board composition of Target Group members
Directors’ and officer indemnity and insurance
Period of undertaking
Release of Target Indemnified Parties
Benefit of undertaking for Target Group
Release of Bidder Indemnified Parties
Benefit of undertaking for Bidder Group
Conduct of business
49
9.1
9.2
9.3
9.4
9.5
9.6
9.7
49
50
52
53
53
54
55
Overview
Target specific obligations
Exceptions to Target conduct of business provisions
Bidder specific obligations
Exceptions to Bidder conduct of business provisions
Access to people and Information
Change of control
Target exclusivity
55
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
55
55
56
56
56
57
57
58
No existing discussions
No-shop
No-talk and no due diligence
Exceptions
Fiduciary exception
Notice of unsolicited approach
Matching right
Legal advice
Target Break Fee
58
11.1
11.2
11.3
11.4
11.5
11.6
11.7
58
59
59
60
60
60
61
Background
Payment by Target to Bidder
No amount payable if Scheme becomes Effective
Timing of payment
Nature of payment
Limitation of liability
Modifications required to Target Break Fee
Bidder Break Fee
61
12.1
12.2
12.3
12.4
12.5
12.6
61
62
62
62
63
63
Background
Payment by Bidder to Target
Bidder Break Fee not payable
Timing of payment
Nature of payment
Limitation of liability
3454-3513-6293v14
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
13
12.7 Modifications required to Bidder Break Fee
64
Bidder Warranties
64
13.1
13.2
13.3
13.4
14
Target warranties
14.1
14.2
14.3
14.4
15
16
Timing for Bidder’s warranties
Disclosure Material
Notification of breach
No other warranties
Timing for Target’s warranties
Disclosure Material
Notification of breach
No other warranties
64
64
64
65
65
65
65
65
65
Termination
66
15.1
15.2
15.3
15.4
66
67
67
67
Termination events
Termination
Effect of termination
Damages
Public announcements
67
16.1 Public announcement of Scheme
16.2 Required disclosure
16.3 Other announcements
67
67
68
17
Confidential Information
68
18
ATA
68
19
Notices and other communications
69
19.1
19.2
19.3
19.4
19.5
69
70
70
70
70
20
GST
20.1
20.2
20.3
20.4
20.5
21
22
Form
Delivery
When effective
When taken to be received
Receipt outside business hours
70
Definitions and interpretation
GST exclusive
Payment of GST
Adjustment events
Reimbursements
70
71
71
71
71
Costs
72
21.1 Costs
21.2 Stamp duty
72
72
General
72
22.1 Variation and waiver
22.2 Consents, approvals or waivers
72
72
3454-3513-6293v14
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
23
22.3 Discretion in exercising rights
22.4 Partial exercising of rights
22.5 Conflict of interest
22.6 Remedies cumulative
22.7 Indemnities and reimbursement obligations
22.8 Inconsistent law
22.9 Supervening law
22.10 Counterparts
22.11 Electronic exchange of documents
22.12 Entire agreement
22.13 Further steps
22.14 No liability for loss
22.15 Severability
22.16 General interpretation
22.17 Rules of construction
22.18 Assignment
22.19 Enforceability
22.20 Best and reasonable endeavours
22.21 No representation or reliance
72
72
72
72
73
73
73
73
73
74
74
74
74
74
75
75
75
75
76
Governing law
76
23.1 Governing law and jurisdiction
23.2 Serving documents
76
76
Schedule 1 - Bidder Warranties
77
Schedule 2 - Target Warranties
80
Execution
84
Annexure A - Deed Poll
87
Annexure B - Scheme
88
Annexure C - Timetable
89
3454-3513-6293v14
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Date 15 September 2023
Parties
Cirrus Networks Holdings Limited ACN 103 348 947 of Level 28, 108 St Georges
Terrace, Perth, Western Australia, 6000 (Target)
Atturra Holdings Pty Ltd ACN 132 368 104 of c/- Kanji Group Pty Limited, ‘Aurora
Place’, Level 33, 88 Phillip Street, Sydney NSW 2000 (Bidder)
Atturra Limited ACN 654 662 638 of c/- Kanji Group Pty Limited, ‘Aurora Place’,
Level 33, 88 Phillip Street, Sydney NSW 2000 (ATA)
Background
A
On 10 September 2023, Target, Bidder and ATA entered into the Scheme
Implementation Deed to record the terms of the proposed acquisition by the
Bidder of all of the ordinary shares in Target by means of a scheme of
arrangement under Part 5.1 of the Corporations Act.
B
Pursuant to clause 22.1 of the Scheme Implementation Deed, the parties
amended and restated the Scheme Implementation Deed on and from the 15
September 2023 in the manner set out in this document.
C
The parties have agreed that Bidder is to acquire all of the ordinary shares in
Target by means of a scheme of arrangement under Part 5.1 of the
Corporations Act.
D
At the request of Bidder, Target intends to propose the Scheme and to issue
the Scheme Booklet.
E
Bidder and Target have agreed to implement the Scheme on the terms of this
document.
F
ATA is the ultimate holding company of the Bidder and has agreed to issue the
ATA Shares.
Agreed terms
1
Definitions
In this document these terms have the following meanings:
Abstain Order
An order made by the Court at or before the First Court
Hearing that a Target Director must abstain from making a
3454-3513-6293v14
Amended and restated Scheme Implementation Deed
page 1
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
recommendation to Target Shareholders due to a Personal
Interest.
Abstaining
Director
A Target Director who is the subject of an Abstain Order.
ASIC
Australian Securities & Investments Commission.
Associate
Has the meaning set out in section 12 of the Corporations
Act.
ASX
ASX Limited (ACN 008 624 691) or the market operated by
it, as the context requires.
ASX Waiver
A waiver of Listing Rule 6.23.2, to the extent necessary to
permit Target to comply with its obligations under clause
5.2 with respect to the cancellation of the Target Security
Interests, without shareholder approval.
ATA Acquisition
Shares
(a)
The Silverdrop Shares; and
(b)
Any ATA Share, ATA Security Interests or agreement
to issue any ATA Share or ATA Security Interests, to
be issued in connection with any acquisition or future
acquisition (whether by share purchase, asset or
business purchase or otherwise) by ATA, the Bidder
or any of their respective Subsidiaries, provided that
such ATA Shares and ATA Security Interests do not
exceed in aggregate 5% of the total number of ATA
Shares on issue as at the date of this document.
ATA Equity Plans
Each of the following equity incentive plans adopted by the
Bidder Group as at the date of this document:
(a)
Atturra Limited Long Term Incentive Plan; and
(b)
Atturra Limited Exempt Employee Share Plan.
ATA Security
Interests
Any shares, options over shares, performance rights or
similar interests issued by ATA, or agreement to grant any
of the foregoing, pursuant to any ATA Equity Plan.
ATA Share
A fully paid ordinary share in the capital of ATA.
ATA VWAP
$0.8815 (rounded to 4 decimal places).
ATA VWAP Period 30 trading days.
ATO
Australian Taxation Office.
Authorised Officer A director, officer or secretary of a party or any other person
nominated by a party to act as an Authorised Officer for the
purposes of this document.
Bankwest Facility
The Multi-option facility and any credit cards.
3454-3513-6293v14
Amended and restated Scheme Implementation Deed
page 2
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Bidder Adverse
Regulatory Event
Any of the following occurs or is initiated by a Governmental
Authority in respect of Bidder:
(a)
the commencement of any investigation, prosecution
or proceedings;
(b)
the issue of any notice, show cause notice,
infringement notices, fines or penalties;
(c)
the suspension, cancellation or variation of any
licences, permits or approvals; or
(d)
any other enforcement or disciplinary action or any
other regulatory intervention,
which adversely materially impacts the businesses,
operations and activities undertaken by, or on behalf of, the
Bidder at any time prior to the Implementation Date, or
which itself may result in a Bidder Material Adverse Effect.
Bidder Board
The board of directors of Bidder.
Bidder Break Fee
$500,000.
Bidder
Confidential
Information
All information (regardless of form) disclosed or otherwise
made available by Bidder Group or its Representatives to
Target or its representatives for or in connection with the
Transaction and all information created by Target (derived
or produced partly or wholly from the Bidder Confidential
Information) in the course of carrying out the Transaction
which:
(a)
is marked as being proprietary or confidential to
Bidder or any of its Related Bodies Corporate;
(b)
is confidential to a third party to whom Bidder Group
owes an obligation of confidence;
(c)
in the circumstances surrounding disclosure or
because of the nature of the information, ought in
good faith to be treated as confidential; or
(d)
includes, or relates to, the business operations and
intentions, financial records (including plans and
projections), intellectual property rights, trade secrets,
financial position, geopolitical information and data,
employees, customers and suppliers of the Bidder
Group,
but does not include information that:
(e)
is or becomes available to Target or any of its
Representatives on a non-confidential basis from a
source (other than Bidder or any of its
3454-3513-6293v14
Amended and restated Scheme Implementation Deed
page 3
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
Representatives) which, to Target’s knowledge, is not
prohibited from disclosing such information to Target;
(f)
is known to Target or any of its Representatives prior
to disclosure by Bidder or any of its Representatives;
(g)
is or has been independently developed by Target
without use of any information furnished to it by
Bidder.
Bidder Disclosure The responses provided by Bidder or its Representatives to
Target or its Representatives to the Project Cumulus –
Materials
Bidder Due Diligence Questionnaire dated 8 September
2023.
Bidder Group
ATA, the Bidder and ATA's Subsidiaries as at the date
immediately before the Implementation Date.
Bidder
Indemnified
Parties
Bidder, ATA and their respective officers and directors, and
each of their Related Bodies Corporate and their respective
officers and directors, and Bidder Indemnified Party has a
corresponding meaning.
Bidder
Information
The information regarding Bidder and ATA (including in
respect of the New ATA Shares and the Merged Group)
provided by Bidder to Target in writing for inclusion in the
Scheme Booklet, being information regarding Bidder
required to be included in the Scheme Booklet under the
Corporations Act, Corporations Regulations or ASIC
Regulatory Guide 60. Bidder Information does not include
information about the Target Group (except to the extent it
relates to any statement of intention relating to the Target
Group following the Effective Date), information provided by
Target to Bidder (or otherwise obtained from Target’s public
filings on ASX and ASIC) contained in, or used for the
preparation of, the information regarding the Merged Group
or the Independent Expert’s Report.
Bidder Knowledge Shan Kanji, Nicole Bowman, Jonathan Rubinsztein,
Stephen Kowal, Herb To, David Dekker, Helen Ord and
Parties
Kunal Shah.
Bidder Material
Adverse Effect
A Bidder Adverse Regulatory Event, or an event, matter or
circumstance which has the effect of, or would be
reasonably likely to have the effect of, either individually or
when aggregated with any other events, matters or
circumstances of a similar type or nature, a reduction by
15% or more of the consolidated EBIT of Bidder Group
below the EBIT as disclosed in its 'FY 23 Annual Results
Presentation' announcement released to ASX on 31 August
2023 as compared to what the consolidated EBIT of Bidder
Group would reasonably have been expected to be but for
3454-3513-6293v14
Amended and restated Scheme Implementation Deed
page 4
DocuSign Envelope ID: 2801B91C-9853-4D64-ACA4-EBB77A737101
the event, matter or circumstance, save for any reduction
caused or reasonably likely to have been caused by any
events, matters or circumstances to the extent resulting
from or arising out of:
(a)
any matter Disclosed to Target prior to the date of this
document, or is known to Target Knowledge Parties,
or to Target or any of its Representatives prior to the
date of this document;
(b)
changes in general economic, industry, banking,
accounting standards, regulatory or political
conditions, the securities or other capital markets in
general or law (including any interpretation or
application of law or standards);
(c)
any epidemic or pandemic;
(d)
geopolitical conditions, hostilities, civil or political
unrest, any acts of war, sabotage, cyberattack or
terrorism (including any outbreak, escalation or
worsening of any of the foregoing);
(e)
arising from acts of God, natural disaster, lightning,
storm, flood, bushfire, earthquake, explosion, cyclone,
tidal wave, landslide, adverse weather conditions on
or after the date of this document;
(f)
any change in taxation rates, interest rates or
exchange rates
(g)
the taking of any action required under this document,
the Scheme or the transactions contemplated by
them;
(h)
the execution, delivery or performance of this
document, the announcement or pendency of the
Scheme or the other transactions contemplated by
this document; and
(i)
any action (or the failure to take any action) with the
written consent or at the written request of Target,
except, in the case of each of the foregoing paragraphs (c),
(d), and (f), if the effects of such events, matters or
circumstanc
Share your feedback
Discover